BEMM RIVER SEWERAGE SCHEME
Installation of Sewer Reticulation, including Pump Stations & Rising Mains
Location: Bemm River, VIC
Client: East Gippsland Water
Value: $ 1.5 Million
Duration: February 2012 to June 2012
Main features of the project:
- Supply and construction of approximately 3,200 lineal meters of DN150mm gravity reticulation
sewers together with approximately 50 manholes and maintenance shafts
- Supply and construction of approximately 1,100 lineal metres of DN40-63mm pressure sewer
- Supply and construction of approximately 1,700 lineal metres of DN110-160mm rising main
- Supply, delivery, installation and testing of three 1.8m dia sewage pump stations
and associated civil and mechanical works
NSW METERING SCHEME
Metre Installations for the Murray Pilot & Murrumbidgee Metering Project
Location: New South Wales and Victoria
Client: Comdain Infrastructure
Value: $ 1,060,000
Duration: January 2012 to August 2012
Main features of the project:
- Supply and installation of 41 metres in the Blight area
- Supply and installation of 36 metres in the Finley area
- Supply and installation of 34 metres in the Jerilderie area
- Supply and installation of 36 metres in the Corryong area
- Provision and maintenance of acceptable safety, quality and environmental systems
HVP PLANTATION GRAVEL CARTAGE
Delivery and Application of Road Base Material using a Grader, Roller, and Watercart
Location: North East Victoria
Client: Hancocks Victorian Plantations
Value: $ 255,000
Duration: March 2012 to May 2012
Main features of the project:
- To load, cart, spread and compact an estimated 3397 m3 of gravel from Mt Emu Quarry to prepare
road beds within the Ovens Plantations
- To load, cart, spread and compact an estimated 2003 m3 of gravel from Knox Pit and Branch Creek
Quarry to prepare road beds within the Bright Plantations
- To load, cart, spread and compact an estimated 1910 m3 of gravel from Rosewhite Quarry to prepare
road beds within the Ovens Plantations
REFURBISHMENT OF THE CHERRY AND CANYON WALKS
Location: Bright, Victoria
Client: Alpine Shire
Value: $ 50,000
Duration: April to May 2012
Main features of the project:
- Upgrade sections of the Cherry and Canyon Walks in Bright.
- The works involve resurfacing sections of the existing walking track along Cherry and Canyon Walks
and other associated works such as step construction, drainage and landscaping.
BOGONG MANAGEMENT TRACKS FLOOD RECOVERY AND REHABILITATION
Location: Alpine National Park, Victoria
Client: Parks Victoria
Value: $ 120,000
Duration: November to December 2012
Main features of the project:
Undertake works to repair and rehabilitate flood-damage management vehicle tracks within the Bogong Unit of the Alpine National Park by:
- Creation of water diversion features as specified
- Re-sheeting narrow road surfaces with crushed rock and/or salvaged batter material as specified
- Repairing and improving drainage with culvert pipe placement
- Regrading drains