BEMM RIVER SEWERAGE SCHEME

Installation of Sewer Reticulation, including Pump Stations & Rising Mains

Location: Bemm River, VIC

Client: East Gippsland Water

Value: $ 1.5 Million

Duration: February 2012 to June 2012

Main features of the project:

-     Supply and construction of approximately 3,200 lineal meters of DN150mm gravity reticulation
       sewers together with approximately 50 manholes and maintenance shafts

-     Supply and construction of approximately 1,100 lineal metres of DN40-63mm pressure sewer

-     Supply and construction of approximately 1,700 lineal metres of DN110-160mm rising main

-     Supply, delivery, installation and testing of three 1.8m dia sewage pump stations
       and associated civil and mechanical works

 

NSW METERING SCHEME

Metre Installations for the Murray Pilot & Murrumbidgee Metering Project

Location: New South Wales and Victoria

Client: Comdain Infrastructure

Value: $ 1,060,000

Duration: January 2012 to August 2012

Main features of the project:

-     Supply and installation of 41 metres in the Blight area

-     Supply and installation of 36 metres in the Finley area

-     Supply and installation of 34 metres in the Jerilderie area

-     Supply and installation of 36 metres in the Corryong area

-     Provision and maintenance of acceptable safety, quality and environmental systems

 

HVP PLANTATION GRAVEL CARTAGE

Delivery and Application of Road Base Material using a Grader, Roller, and Watercart

Location: North East Victoria

Client: Hancocks Victorian Plantations

Value: $ 255,000

Duration: March 2012 to May 2012

Main features of the project:

-     To load, cart, spread and compact an estimated 3397 m3 of gravel from Mt Emu Quarry to prepare
       road beds within the Ovens Plantations

-     To load, cart, spread and compact an estimated 2003 m3 of gravel from Knox Pit and Branch Creek
       Quarry to prepare road beds within the Bright Plantations

-     To load, cart, spread and compact an estimated 1910 m3 of gravel from Rosewhite Quarry to prepare
       road beds within the Ovens Plantations

 

REFURBISHMENT OF THE CHERRY AND CANYON WALKS

Location: Bright, Victoria

Client: Alpine Shire

Value: $ 50,000

Duration: April to May 2012

Main features of the project:

-     Upgrade sections of the Cherry and Canyon Walks in Bright.

-     The works involve resurfacing sections of the existing walking track along Cherry and Canyon Walks
       and other associated works such as step construction, drainage and landscaping.

 

BOGONG MANAGEMENT TRACKS FLOOD RECOVERY AND REHABILITATION

Location: Alpine National Park, Victoria

Client: Parks Victoria

Value: $ 120,000

Duration: November to December 2012

Main features of the project:

Undertake works to repair and rehabilitate flood-damage management vehicle tracks within the Bogong Unit of the Alpine National Park by:

-          Creation of water diversion features as specified

-          Re-sheeting narrow road surfaces with crushed rock and/or salvaged batter material  as specified

-          Repairing and improving drainage with culvert pipe placement

-          Regrading drains